On 10.08.2023, the bunkering of the Vadul Oii ship will take place and will last approximately 2 hours. During the bunkering crossing at the Galati point – I.C. Brătianu will be provided by the small ferry, Poienari 2, only for cars, which will run non-stop, without respecting the schedule.